Pinpoint Test F: The Individual Component Illumination Is Inoperative
Instrument Cluster and Panel Illumination
Pinpoint Tests
Pinpoint Test F: The Individual Component Illumination is Inoperative
Refer to Wiring Diagram Set 71 (Escape/Mariner, Escape Hybrid/Mariner Hybrid), Cluster and Panel Illumination for schematic and connector information. Diagrams By Number
Normal Operation
The Smart Junction Box (SJB) sends a Pulse Width Modulated (PWM) voltage to the dimmable components through circuit VLN04. Ground is provided through circuits GD112 (BK/GN), GD114 (BK/BU) and GD908 (BK).
This pinpoint test is intended to diagnose the following:
- Wiring, terminals or connectors
- Floor shifter
- Headlamp switch
- Message center switches
- Traction assist/parking aid disable switch
- Ambient lighting switch
PINPOINT TEST F: THE INDIVIDUAL COMPONENT ILLUMINATION IS INOPERATIVE
NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the connector.
NOTE: Failure to disconnect the battery when instructed will result in false resistance readings. Refer to Battery.
-------------------------------------------------
F1 CHECK THE VOLTAGE TO THE SINGLE ILLUMINATION SOURCE
- Ignition OFF.
- Disconnect: Inoperative Illumination Source.
- Place the headlamp switch to the PARKING LAMPS ON position.
- Rotate the instrument panel dimmer switch to the full illumination position.
- Measure the voltage between the inoperative illumination source, harness side and ground as follows:
- Are the voltages greater than 10 volts?
Yes
TURN headlamps off. GO to F2 .
No
REPAIR the circuit. TEST the system for normal operation.
-------------------------------------------------
F2 CHECK THE GROUND CIRCUIT TO THE SINGLE ILLUMINATION SOURCE FOR AN OPEN
- Ignition OFF.
- Disconnect: Negative Battery Cable.
- Measure the resistance between the inoperative illumination source, harness side and ground according to the following table:
- Is the resistance less than 5 ohms?
Yes
INSTALL a new component in question. TEST the system for normal operation.
No
REPAIR the ground circuit in question. TEST the system for normal operation.
-------------------------------------------------