Cylinder Head Assembly
General Specifications (Part 1):
General Specifications (Part 2):
General Specifications (Part 3):
a Time required for the plunger to leak down 1.6 mm of travel with 222 N force and leak-down fluid in the lash adjuster.
b The pin bore and crank bearing bore must be parallel and in the same vertical plane within the specified total difference when measured at the ends of a 203 mm bar, 105.5 mm on each side of rod centerline.
Cylinder Head
NOTE: The cylinder head bolts must be discarded and new bolts installed. They are a tighten-to-yield design and cannot be reused.
LH Cylinder Head
Tighten the 10 LH cylinder head bolts in 3 stages, in the sequence shown.
- Stage 1: Tighten to 40 Nm (30 lb-ft)
- Stage 2: Tighten an additional 90 degrees
- Stage 3: Tighten an additional 90 degrees
RH Cylinder Head
Tighten the bolts in the following 3 stages, in the sequence shown.
- Stage 1: Tighten to 40 Nm (30 lb-ft)
- Stage 2: Tighten an additional 90 degrees
- Stage 3: Tighten an additional 90 degrees
Intake Manifold
Tighten the 9 intake manifold bolts in the sequence shown.
- Tighten to 10 Nm (89 lb-in)
Camshaft Bearing Cap
Tighten the 13 bolts in the sequence shown.
- Tighten to 10 Nm (89 lb-in)
Camshaft Sprocket
Tighten the bolt in 2 stages:
- Stage 1: Tighten to 40 Nm (30 lb-ft)
- Stage 2: Tighten an additional 90 degrees
Exhaust Manifold
RH
LH
Tighten the 8 new nuts in the sequence shown.
- Tighten to 25 Nm (18 lb-ft)