Pinpoint Test A: The Brake Shift Interlock System Does Not Release/Lock Correctly




External Controls

Pinpoint Tests

PINPOINT TEST A: THE BRAKE SHIFT INTERLOCK SYSTEM DOES NOT RELEASE/LOCK CORRECTLY

-------------------------------------------------
A1 TEST THE BRAKE LIGHTS

- Apply the brake pedal and view the brake lights.
- Do the brake lights illuminate?

Yes
GO to A2.

No
REPAIR the brake lights, REFER to Exterior Lighting Testing and Inspection.

-------------------------------------------------
A2 TEST BCM FUSE 18 (10A)

- Remove Body Control Module (BCM) fuse 18 (10A).
- Check fuse: BCM 18 (10A) .
- Is the resistance less than 5 ohms?

Yes
REINSTALL the fuse. GO to A4.

No
GO to A3.

-------------------------------------------------
A3 CHECK BCM FOR AN INTERNAL SHORT

- Disconnect: BCM C2280B .
- Inspect for damaged or pushed-out terminals, corrosion or loose wires. Repair as necessary.
- Install a new fuse.
- Did the fuse fail?

Yes
INSTALL a new BCM. REFER to Multifunction Electronic Modules Service and Repair. RECONNECT all components. TEST the system for normal operation.

No
GO to A4.

-------------------------------------------------
A4 CHECK THE BSIA POWER CIRCUIT FOR A SHORT TO GROUND

- Disconnect: Brake Shift Interlock Actuator (BSIA) C2008 .
- Disconnect: BCM C2280B.
- Inspect for damaged or pushed-out terminals, corrosion or loose wires. Repair as necessary.
- Measure the resistance between BSIA C2008-4, circuit CET53 (BU/OG), harness side and ground.




- Is the resistance greater than 10,000 ohms?

Yes
GO to A5.

No
REPAIR circuit CET53 (BU/OG) for a short to ground. RECONNECT all components. CLEAR the DTC. TEST the system for normal operation.

-------------------------------------------------
A5 CHECK THE BSIA POWER CIRCUIT FOR AN OPEN

- Measure the resistance between BSIA C2008-4, circuit CET53 (BU/OG), harness side and BCM C2280B-49, circuit CET53 (BU/OG), harness side.




- Is the resistance less than 5 ohms?

Yes
GO to A6.

No
REPAIR circuit CET53 (BU/OG) for an open. RECONNECT all components. CLEAR the DTC. TEST the system for normal operation.

-------------------------------------------------
A6 TEST THE BSIA GROUND CIRCUIT FOR AN OPEN

- Measure the resistance between BSIA C2008-1, circuit GD115 (BK/GY), harness side and ground.




- Is the resistance less than 5 ohms?

Yes
GO to A7.

No
REPAIR circuit GD115 (BK/GY) for an open. RECONNECT all components. CLEAR the DTC. TEST the system for normal operation.

-------------------------------------------------
A7 TEST THE BSIA POWER CIRCUIT FOR VOLTAGE

- Connect: BCM C2008B.
- Ignition ON.
- Measure the voltage at the BSIA C2008-4, circuit CET53 (BU/OG), harness side, while applying the brake pedal.




- Is the voltage greater than 10 volts with the brake pedal applied?

Yes
INSTALL a new BSIA. REFER to Brake Shift Interlock Actuator Service and Repair. RECONNECT all components. CLEAR the DTC. TEST the system for normal operation.

No
INSTALL a new BCM. REFER to Multifunction Electronic Modules Service and Repair. RECONNECT all components. CLEAR the DTC. TEST the system for normal operation.

-------------------------------------------------