Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Cylinders8.80.0BIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
One Cylinder8.00.0BIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
NOTE
With AC, Add1.00.0B
To Spark Plugs, Add0.30.0B
To R&R Connecting Rod Bearings, Add
Each0.10.0B
To R&R Piston, Pin or Connecting Rod, Add
One0.20.0B
Each Additional0.10.0B
All0.50.0B
To R&R Timing Chain, Add0.60.0B