Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Main Relay (Computer/Fuel System): Testing and Inspection





Circuit Diagram








Harness Inspection Procedure

Harness Inspection Procedure
1. Check continuity of relay contacts by energizing terminals 4(+) and 2(-).





Between terminals 5 and 1
When de-energized: no continuity
When energized: continuity





Between terminals 5 and 3
When de-energized: no continuity
When energized: continuity


2. If faulty, replace the MFI control relay.

Tightening torque: 7 - 11 Nm (5.2 - 8.1 ft lb)