Operation CHARM: Car repair manuals for everyone.

Camshaft, Engine

Bearing Clearance 0.001-0.003 Inch (in)
Journal Diameter # 1 2.029-2.030 Inch (in)
Journal Diameter # 2 2.019-2.020 Inch (in)
Journal Diameter # 3 2.009-2.010 Inch (in)
Journal Diameter # 4 1.999-2.000 Inch (in)
Base Circle Runout Max. 0.001 Inch (in)
Valve Lift Intake 0.4075 Inch (in)
Exhaust 0.4145 Inch (in)
Valve Timing-Intake Opens 12.4 Degrees Before Top Dead Center (deg BTDC)
Closes 60.9 Degrees After Bottom Dead Center (deg ABDC)
Duration 253.3 Degrees (deg)
Valve Timing-Exhaust Opens 49.8 Degrees Before Bottom Dead Center (deg BBDC)
Closes 29.2 Degrees After Top Dead Center (deg ATDC)
Duration 259 Degrees (deg)
Valve Overlap 41.6 Degrees (deg)