Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation






INSTALLATION




1. Add MOPAR(R) Gasket Maker, Loctite(R) 518, or equivalent around inside of all holes and on mating flange.




2. Install the shift lever assembly (1) into the transmission case (2).




3. Install thenew bolts (1) holding the shift lever assembly (2) to the transmission and tighten to 19 Nm (168 in. lbs.)




4. Install new shift tower lock ball for shift detent (5) and tighten to 29 Nm (277 in. lbs.).
5. Install new shift lock ball for the select detent (3) and tighten to 39 Nm (345 in. lbs.).
6. Install new shift tower shift guide pin (2) and tighten to 30 Nm (277 in. lbs.).





CAUTION: Be sure to verify bracket position after installation.

7. Install the nut (4) holding the crossover rod (2) to the shift lever. Be sure to use a wrench (1) to hold the ball stud to prevent it from rotating in the shift lever tighten to 12 Nm (106 in. lbs.).