Installation
INSTALLATION
NOTE: LHD gasoline model shown. Diesel and RHD models similar.
1. Position the blower motor relay (2) into the proper receptacle of the power distribution center (PDC) (1).
NOTE: Refer to the fuse and relay layout map on the inside of the PDC cover for blower motor relay location.
2. Align the blower motor relay terminals with the terminal cavities in the PDC receptacle and push down firmly on the relay until the terminals are fully seated.
3. Close the cover of the PDC.
4. Reconnect the negative battery cable.