Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Canister Purge Control Valve: Testing and Inspection

EVAPORATIVE (EVAP) CANISTER PURGE SOLENOID VALVE

INSPECTION

NOTE: When disconnecting the vacuum hose, make an identification mark on it so that it can be reconnected to its original position.

1. Disconnect the vacuum hose from the solenoid valve.
2. Detach the harness connector.
3. Connect a vacuum pump to the nipple to which the red-striped vacuum hose was connected.







4. Apply vacuum and check when voltage is applied to the PCSV and when the voltage is discontinued.




5. Measure the resistance between the terminals of the solenoid valve.

PCSV coil resistance (Ohm):
20 - 24 Ohm at -20 °C (-4 °F)
22 - 26 Ohm at 0 °C (32 °F)
24 - 28 Ohm at 20 °C (68 °F)
25 - 29 Ohm at 40 °C (104 °F)
27 - 31 Ohm at 60 °C (140 °F)
29 - 33 Ohm at 80 °C (176 °F)