Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

EGR Control Solenoid: Testing and Inspection

Vacuum Switching Valve:




- Disconnect VSV electrical connector.
- Disconnect vacuum hoses.
- Remove bolt, and remove VSV from intake manifold.

VSV Inspection - Checking Resistance:





- Connect ohmmeter across VSV terminals.

Resistance 33 - 39 ohms

VSV Inspection - Checking For Short:





- Check that there is no continuity between either terminal and VSV case.

VSV Inspection - Checking Operation:





- Blow air into port E. Air should flow from port G with high resistance.

VSV Inspection - Checking Operation:





- Apply battery voltage across solenoid terminals.
- Blow air into port E. Air should flow from port G easily.
- If any step failed to produce desired results, replace VSV.