Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Refrigerant Pressure Sensor / Switch: Testing and Inspection

ON-VEHICLE INSPECTION





1. DISCONNECT CONNECTOR FROM PRESSURE SWITCH
2. INSTALL MANIFOLD GAUGE SET
3. RUN ENGINE AT APPROX. 1,500 RPM
4. INSPECT PRESSURE SWITCH OPERATION






Magnetic Clutch Control:
(a) Connect the positive (+) lead from the ohmmeter to terminal 4 and the negative (-) lead to terminal 1.
(b) Check continuity between the terminals when refrigerant pressure is changed. as shown in the illustration.
If operation is not as specified, replace the pressure switch.





Cooling Fan Control:
(a) Connect the positive (+) lead from the ohmmeter to terminal 2 and the negative (-) lead to terminal 3.
(b) Check continuity between the terminals when refrigerant pressure is changed, as shown in the illustration.
If operation is not as specified. replace the pressure switch.

5. STOP ENGINE AND REMOVE MANIFOLD GAUGE SET

6. CONNECT CONNECTOR TO PRESSURE SWITCH