Installation
DIFFERENTIAL: FRONT DIFFERENTIAL CARRIER ASSEMBLY:
INSTALLATION
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Install the No. 1 mounting support with the 3 bolts.
Torque: 186 Nm (1,900 kgf-cm, 137 ft-lbf)
(b) Install the No. 2 mounting support with the 2 bolts.
Torque: 160 Nm (1,630 kgf-cm, 118 ft-lbf)
(c) Install the No. 3 front differential support with the 2 bolts.
Torque: 108 Nm (1,100 kgf-cm, 80 ft-lbf)
(d) Support the front differential with a jack.
(e) Install the 2 front mounting bolts and nuts.
Torque: 137 Nm (1,400 kgf-cm, 101 ft-lbf)
(f) Install the No. 1 front differential mount nut.
Torque: 87 Nm (887 kgf-cm, 64 ft-lbf)
(g) Install the front differential breather tube bracket with the bolt.
Torque: 13 Nm (133 kgf-cm, 10 ft-lbf)
(h) Lower the jack.
2. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH Installation
3. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH
HINT: Use the same procedure as for the LH side.
4. INSTALL FRONT AXLE ASSEMBLY LH Installation
5. INSTALL FRONT AXLE ASSEMBLY RH
HINT: Use the same procedures as for the LH side.
6. INSTALL NO. 1 FRONT SUSPENSION ARM SUB-ASSEMBLY LOWER LH Installation
7. INSTALL NO. 1 FRONT SUSPENSION ARM SUB-ASSEMBLY LOWER RH
HINT: Use the same procedures as for the LH side.
8. INSTALL TIE ROD END SUB-ASSEMBLY LH Installation
9. INSTALL TIE ROD END SUB-ASSEMBLY RH
HINT: Use the same procedures as for the LH side.
10. INSTALL FRONT STABILIZER LINK ASSEMBLY LH Installation
11. INSTALL FRONT STABILIZER LINK ASSEMBLY RH
HINT: Use the same procedure as for the LH side.
12. INSTALL FRONT AXLE SHAFT LH NUT Installation
13. INSTALL FRONT AXLE SHAFT RH NUT
HINT: Use the same procedure as for the LH side.
14. INSPECT BEARING BACKLASH Axle System
15. INSPECT AXLE HUB DEVIATION Axle System
16. INSTALL FRONT AXLE HUB GREASE CAP LH Installation
17. INSTALL FRONT AXLE HUB GREASE CAP RH
HINT: Use the same procedures as for the LH side.
18. INSTALL FRONT SPEED SENSOR LH Installation
19. INSTALL FRONT SPEED SENSOR RH
HINT: Use the same procedure as for the LH side.
20. INSTALL FRONT PROPELLER SHAFT ASSEMBLY Installation
21. FILL UP DIFFERENTIAL OIL Adjustments
22. INSPECT DIFFERENTIAL OIL Adjustments
23. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque: 29 Nm (296 kgf-cm, 21 ft-lbf)
24. INSTALL REAR ENGINE UNDER COVER ASSEMBLY
Torque: 29 Nm (296 kgf-cm, 21 ft-lbf)
25. INSTALL FRONT WHEEL
Torque: 112 Nm (1,142 kgf-cm, 83 ft-lbf)
26. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
27. INSPECT CHECK ABS SENSOR SIGNAL
HINT: Test Mode Procedure