Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








POWER STEERING: POWER STEERING ECU: INSTALLATION

INSTALLATION

1. INSTALL POWER STEERING ECU





(a) Attach the claw and install the power steering ECU with the 4 bolts.
Torque: 8.5 Nm (87 kgf-cm, 75 in-lbf)
(b) Connect connector C to the power steering ECU.





(c) Connect the 2 power steering ECU connectors A and B and securely lock the connectors.
2. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY
(a) Install the inlet cover with the 2 clips.
3. INSTALL ENGINE ROOM SIDE COVER
(a) Install the side cover with the 4 clips.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. INSTALL COWL TOP VENTILATOR LOUVER RH Installation

6. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

7. PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
(a) Perform variable gear ratio steering system calibration Variable Gear Ratio Steering System.