Installation
2GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION
INSTALLATION
1. INSTALL THROTTLE BODY
(a) Install a new throttle body gasket to the intake air surge tank.
(b) Install the throttle body with the 4 bolts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Connect the 2 water by-pass hoses.
(d) Connect the throttle body connector and clamp.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
(a) Install the air cleaner cap sub-assembly with the 2 bolts.
(b) Connect the the vacuum hose (EVAP) to the air cleaner hose.
(c) Install the ventilation hose No. 2 and air cleaner hose band.
(d) Connect the 3 vacuum hoses.
4. INSTALL NO. 1 AIR CLEANER INLET Installation
5. INSTALL NO. 2 AIR CLEANER INLET Installation
6. ADD ENGINE COOLANT Testing and Inspection
7. INSPECT FOR COOLANT LEAK Testing and Inspection
8. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY Installation
9. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
10. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY Installation
11. INSTALL WINDSHIELD WIPER LINK ASSEMBLY