Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








3UZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION

INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)





(a) Install a new O-ring to the oil control valve.
(b) Install the oil control valve with the bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(c) Connect the oil control valve connector.





(d) Connect the engine wire protector with the 2 bolts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)





(a) Install a new O-ring to the oil control valve.
(b) Install the oil control valve with the bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(c) Connect the oil control valve connector.
3. INSTALL INTAKE AIR CONNECTOR PIPE
(a) Connect the air hose and ventilation hose.
(b) Install the bolt and intake air connector pipe with the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(c) Tighten the 2 hose clamps.
Torque: 4.0 Nm (41 kgf-cm, 35 in-lbf)
4. INSTALL V-BANK COVER
(a) Install the cover with the 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
6. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.