Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation





AIR CONDITIONING: WATER HOSE JOINT: INSTALLATION

1. INSTALL WATER HOSE JOINT

(a) Connect the 2 hoses, and install the water hose joint with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

2. INSTALL WATER BY-PASS GLOW PLUG Installation

3. INSTALL HEATER WATER INLET HOSE Installation

4. INSTALL HEATER WATER OUTLET HOSE Installation

5. INSTALL V-BANK COVER SUB-ASSEMBLY (for 2GR-FSE) Installation

6. INSTALL V-BANK COVER SUB-ASSEMBLY (for 4GR-FSE) Installation

7. ADD ENGINE COOLANT (for 2GR-FSE) Testing and Inspection

8. ADD ENGINE COOLANT (for 4GR-FSE) Testing and Inspection

9. WARM UP ENGINE Service and Repair

10. INSPECT FOR COOLANT LEAK (for 2GR-FSE) Testing and Inspection

11. INSPECT FOR COOLANT LEAK (for 4GR-FSE) Testing and Inspection