Valve Body: Testing and Inspection
Inspection
1. Disconnect the negative battery cable
2. Remove the resonance duct and the air cleaner assembly.
3. Disconnect the solenoid connector.
4. Measure resistance between each terminal (A, B, C, D) and a ground.
Resistance: 13 - 27 Ohm
5. If not as specified, replace the solenoid valve.
6. Connect the solenoid connector.
7. Install the air cleaner assembly and the resonance duct.
8. Connect the negative battery cable.