Transmission Speed Sensor: Testing and Inspection
InspectionInspection of resistance
1. Disconnect the negative battery cable.
2. Remove the battery, air cleaner assembly, and battery carrier.
3. Disconnect the input/turbine speed sensor connector.
4. Measure resistance between the terminals of the input/turbine speed sensor.
Resistance: 200-400 Ohms
(ATF temperature: -40-160 °C {-40-320 °F})
5. If not correct, replace the input/turbine speed sensor.
6. Connect the input/turbine speed sensor connector.
7. Install the battery carrier, air cleaner assembly, and battery.
8. Connect the negative battery cable.