Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

EGR Monitor Repair Verification Drive Cycle

NOTE: The ambient air temperature or IAT PID must read a minimum of 32°F (0°C) to initiate the EGR Monitor.

1. Follow the OBD II Drive Cycle Preparation Steps.
2. Start the engine and drive the vehicle for 6 minutes.
3. Drive in stop and go traffic for 5 minutes with at least two idle periods.
4. Accelerate to 45 mph (72 km/h). Maintain speed for 1 minute.
5. Rerun Continuous Memory, KOEO and KOER self-tests.