General Procedures (Steering)
GENERAL PROCEDURES (STEERING)Wheels and Tire Installation
1. When installing the wheels and tires, tighten the wheel nuts in a criss-cross pattern to the following tightening torque.
Tightening torque 107.8 - 147.0 Nm (11.0 - 14.9 kgf-m, 79.6 - 108.4 ft-lbf)
Connector Disconnection
1. Disconnect the negative battery cable before performing any work that requires handling of connectors.
Power Steering Components Removal/Installation
1. If any power steering fluid line has been disconnected anytime during the procedure, add ATF M-III, M-V or Dexron II, bleed the fluid lines, and inspect for leakage after the procedure has been completed.