Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Full-Auto Air Conditioner





REFRIGERANT PRESSURE SENSOR INSPECTION [FULL-AUTO AIR CONDITIONER]

1. Install the manifold gauge.

2. Verify the high-pressure side reading of the manifold gauge.

3. Measure the terminal voltage of the PCM.

- 1AR, 1J or 1AE (MZR 2.5)

- 1AT, 1M or 1BJ (MZI 3.7 V6)

4. Verify that below graph as measure the terminal voltage 1J (MZR 2.5), 1M (MZI 3.7 V6).

5. Follow the PCM inspection when measure the other terminal voltage. Component Tests and General Diagnostics

- Terminal 1AR (MZR 2.5), 1AT (MZI 3.7 V6): 1.0 V or less
- Terminal 1AE (MZR 2.5), 1BJ (MZI 3.7 V6): Approx. 5 V (Ignition switch on)

- If the each voltage is not normal, inspect the related wiring harness.

- If there is any malfunction, replace the related wiring harness.
- If wiring harness is normal, replace the refrigerant pressure sensor.

MZR 2.5





MZI 3.7 V6