Turbocharger
Part name
Tightening torque
1: 52 N・m { 5.3 kgf・m / 38 lb・ft }
2: 10.0 N・m { 1.0 kgf・m / 89 lb・in }
5: 25 N・m { 2.5 kgf・m / 18 lb・ft }
7: 25 N・m { 2.5 kgf・m / 18 lb・ft }
8: 52 N・m { 5.3 kgf・m / 38 lb・ft }
9: 10.0 N・m { 1.0 kgf・m / 89 lb・in }
11: 25 N・m { 2.5 kgf・m / 18 lb・ft }
12: 22.5 N・m { 2.3 kgf・m / 17 lb・ft }
13: 25 N・m { 2.5 kgf・m / 18 lb・ft }
15: 52 N・m { 5.3 kgf・m / 38 lb・ft }
16: 52 N・m { 5.3 kgf・m / 38 lb・ft }
17: 52 N・m { 5.3 kgf・m / 38 lb・ft }
18: 52 N・m { 5.3 kgf・m / 38 lb・ft }
21: 52 N・m { 5.3 kgf・m / 38 lb・ft }
1) Perform the following procedures before installing the turbocharger.
2) After installing the turbocharger, warm up the engine at idle.
Caution
1) Install the water feed and return pipe, as well as the gasket to the turbocharger.
Caution
Tightening torque: 10.0 N・m { 1.0 kgf・m / 89 lb・in }
2) Feed 1 cc (approximately 20 drops) of engine oil into the oil feed port.
3) Install the turbocharger and gasket to the exhaust manifold.
Caution
Tightening torque: 52 N・m { 5.3 kgf・m / 38 lb・ft }
1) Install the turbocharger heat protector to the turbocharger.
Tightening torque: 25 N・m { 2.5 kgf・m / 18 lb・ft }
1) Temporarily tighten the turbocharger bracket to the turbocharger and cylinder block in the order shown in the diagram.
2) Final tighten the turbocharger bracket to the turbocharger and cylinder block in the order shown in the diagram.
Tightening torque: 52 N・m { 5.3 kgf・m / 38 lb・ft }
1) Install the gasket to the turbocharger oil pipe.
Caution
2) Install the turbocharger oil pipe and gasket to the turbocharger.
Caution
Tightening torque: 10.0 N・m { 1.0 kgf・m / 89 lb・in }
Legend
3) Install the turbocharger oil pipe (feed side) to the cylinder block.
Caution
Tightening torque: 22.5 N・m { 2.3 kgf・m / 17 lb・ft } Eyebolt
Tightening torque: 25 N・m { 2.5 kgf・m / 18 lb・ft } Bolt
Legend
4) Install the turbocharger oil pipe (return side) and gasket to the cylinder block.
Caution
Tightening torque: 25 N・m { 2.5 kgf・m / 18 lb・ft }
Legend
1) Connect the turbocharger water return hose to the water feed pipe and return pipe.
2) Connect the turbocharger water feed hose to the water feed pipe and return pipe.
Legend
Refer to "1.Engine 1G.Exhaust(RZ4E-TC) exhaust pipe installation".
Refer to "1.Engine 1G.Exhaust(RZ4E-TC) catalytic converter installation".
1) Install the vacuum hose to the turbocharger and vacuum pipe.
1) Install the air cleaner to the vehicle.
Tightening torque: 20 N・m { 2.0 kgf・m / 15 lb・ft }
Legend
2) Connect the connector to the barometric pressure sensor.
3) Connect the connector to the MAF and IAT sensor.
1) Install the intake hose to the turbocharger and air pipe.
Caution
Tightening torque: 5.0 N・m { 0.5 kgf・m / 44 lb・in } Clamp
Legend
1) Align the air duct with the air cleaner and turbocharger.
Legend
2) Referring to the diagram, align the alignment mark positions and connect the air duct to the turbocharger.
Tightening torque: 4.0 N・m { 0.4 kgf・m / 35 lb・in }
Legend
3) Install the PCV hose to the cylinder head cover and air duct.
Caution
Legend
4) Install the intake air duct to the air cleaner and radiator core support.
Legend
1) Install the engine cover to the engine.
Legend
1) Lower the vehicle.
2) Connect the battery cable to the battery negative terminal.
3) Referring to the following, perform the setting of the front door power window switch with AUTO UP/AUTO DOWN function.
Refer to "9.Body, Cab, Accessories 9T.Glass, Windows, Mirrors front door power window switch setting".
4) Close the engine hood.
1) Fill with engine coolant up to the radiator filler neck.
Note
Caution
2) While pressing the radiator upper hose manually several times to bleed the air from the hose, fill the radiator with engine coolant.
Note
Caution
3) Add engine coolant up to the MAX line of the radiator reserve tank.
Legend
4) Install the radiator cap to the radiator.
5) Start and idle the engine.
Caution
6) Stop the engine.
7) Remove the radiator cap from the radiator.
Warning
8) Fill with engine coolant up to the radiator filler neck.
Note
9) Install the radiator cap to the radiator.
10) Start the engine.
11) Increase the engine speed to around 2000 rpm and run the engine for 10 minutes once the engine coolant temperature gauge reaches the center.
12) With the engine running, check that the thermostat valve is open.
Note
Caution
13) Idle the engine for 5 minutes.
14) Stop the engine.
15) Remove the radiator cap from the radiator.
Warning
16) Fill with engine coolant up to the radiator filler neck.
Note
17) Add engine coolant up to the MAX line of the radiator reserve tank.
18) Install the radiator cap to the radiator.
19) Repeat steps 10 to 18 until the coolant level no longer lowers.
Caution