EGR VALVE INSPECTION[LF, L3]
id0116c2801100
On-vehicle Inspection
1. Verify that the buzzing sound (valve operation sound) is heard from the EGR valve when engine cranking.
-
• If the buzzing sound is not heard, perform the resistance inspection.
Resistance Inspection
1. Remove the battery cover (See BATTERY REMOVAL/INSTALLATION[LF, L3].)
2. Disconnect the negative battery cable.
3. Disconnect the EGR valve connector.
4. Measure the resistance between the EGR valve terminals.
-
• If within the specification, perform out the “Circuit Open/Short Inspection”.
Standard
Terminal
|
Resistance (ohm)
|
C—E
C—A
D—B
D—F
|
12—16
|
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION[LF, L3].)
2. Inspect the following wiring harnesses for an open or short circuit (continuity check).
-
Open circuit
-
• If there is no continuity, the circuit is open. Repair or replace the wiring harness.
-
― EGR valve terminal A and PCM terminal 2G*1, 2AR*2
― EGR valve terminal B and PCM terminal 2L*1, 2AY*2
― EGR valve terminal C and main relay terminal A
― EGR valve terminal D and main relay terminal A
― EGR valve terminal E and PCM terminal 2K*1, 2AU*2
― EGR valve terminal F and PCM terminal 2H*1, 2AV*2
-
Short circuit
-
• If there is continuity, the circuit is short. Repair or replace the wiring harness.
-
― EGR valve terminal A and power supply
― EGR valve terminal A and body ground
― EGR valve terminal B and power supply
― EGR valve terminal B and body ground
― EGR valve terminal C and body ground
― EGR valve terminal D and body ground
― EGR valve terminal E and power supply
― EGR valve terminal E and body ground
― EGR valve terminal F and power supply
― EGR valve terminal F and body ground
*1 :MTX, LF ATX (FS5A-EL)
*2 :LF ATX (FN4A-EL), L3 ATX