BOOST AIR TEMPERATURE SENSOR INSPECTION[L3 Turbo]


id0140b6802100


Resistance Inspection

Note
•  Before performing the following inspection, make sure to follow the procedure as indicated in the troubleshooting flowchart. (See HOW TO USE THIS MANUAL.)

1.  Disconnect MAP/boost air temperature sensor.

2.  Measure the resistance between the MAP/boost air temperature sensor terminals A and B using a tester.

acxuuw00000094

•  If not as specified, replace the MAP/boost air temperature sensor. (See INTAKE AIR SYSTEM REMOVAL/INSTALLATION[L3 Turbo].)
•  If the MAP/boost air temperature sensor is normal, but PID are out of specification, perform the “Circuit Open/Short Inspection”.

Specification

Ambient temperature (°C {°F})

Resistance (kilohm)

20 {68}
2.4—2.7
60 {140}
0.59—0.64


Circuit Open/Short Inspection

acxuuw00000094
acxuuw00000095

1.  Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION[L3 Turbo].)

2.  Inspect the following wiring harnesses for an open or short circuit. (Continuity check)


Open circuit

•  If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
―  MAP/boost air temperature sensor terminal A and PCM terminal 2AV
―  MAP/boost air temperature sensor terminal B and PCM terminal 2N
―  MAP/boost air temperature sensor terminal C and PCM terminal 2AU


Short circuit

•  If there is continuity, there is a short circuit. Repair or replace the wiring harness.
―  MAP/boost air temperature sensor terminal A and power supply
―  MAP/boost air temperature sensor terminal B and power supply
―  MAP/boost air temperature sensor terminal B and body ground
―  MAP/boost air temperature sensor terminal C and body ground