GENERAL PROCEDURES (FRONT AND REAR AXLES)


id031000800100


Wheel and Tire Installation

1.  When installing the wheels and tires, tighten the wheel nuts in a criss-cross pattern to the following tightening torque.

Tightening torque
88.2—117.6 N·m {9.00—11.99 kgf·m, 65.06—86.73 ft·lbf}

Connector Disconnection

1.  Disconnect the negative battery cable before performing any work that requires handling of connectors. (See BATTERY REMOVAL/INSTALLATION [ZJ, ZY, Z6].) (See BATTERY REMOVAL/INSTALLATION [LF, L3].) (See BATTERY REMOVAL/INSTALLATION [L3 Turbo].) (See BATTERY REMOVAL/INSTALLATION [MZ-CD 1.6 (Y6)].) (See BATTERY REMOVAL/INSTALLATION [MZR-CD (RF Turbo)].)


Suspension Links Removal/Installation

1.  For the joint sections with rubber bushings, raise the vehicle using a lift, and then temporarily tighten the installation bolts and nuts. Lower the vehicle to the ground and tighten them completely with the specified torque.