BASS-BOX INSPECTION


id092000815100

1.  Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)(See BATTERY REMOVAL/INSTALLATION [MZR 2.0, MZR 2.5].)(See BATTERY REMOVAL/INSTALLATION [MZR 2.0 DISI i-stop].)(See BATTERY REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo].)(See BATTERY REMOVAL/INSTALLATION [MZR-CD 2.2].)(See BATTERY REMOVAL/INSTALLATION [SKYACTIV-G 2.0].)(See BATTERY REMOVAL/INSTALLATION [MZ-CD 1.6].)

2.  Disconnect the connector. (See BASS-BOX REMOVAL/INSTALLATION.)

3.  Verify the resistance between bass-box terminals.

am6zzw00002195

•  If not within the specification, replace the bass-box.
am3uuw00007314
Resistance
0.9—1.1 ohms