Operation CHARM: Car repair manuals for everyone.

AR18.10-P-2140-02TX Rivet Oil Pump Chain



AR18.10-P-2140-02TX Rivet Oil Pump Chain





602 589 00 98 00
Case





642 589 00 33 00
Riveting tool





271 589 10 63 00
Thrust spindle





271 589 02 40 00
Assembly link





271 589 02 63 00
Assembly inserts





1 Connect new oil pump chain (2) and old oil pump chain (1) together using an assembly link (3)

2 Slowly rotate crankshaft in the direction of engine rotation (arrowed) until it is possible to connect both ends of the new oil pump chain (2).

3 Remove assembly link (3) and old oil pump chain (1).





4 Connect ends of new oil pump chain (2) using a riveted link (4).
Insert riveted link (4) from front.





5 Place assembly insert with digit F10 into rivet press tool (arrow) and fix in place by a bolt (28).





6 Place moveable assembly insert with digit D10 into rivet press tool (arrow).





7 Insert outer plate (5) of the rivet link (4) into the assembly insert with the digit D10 (arrow).





8 Place rivet press tool on the new oil pump chain (2).
Fit in such a way that the rollers of the riveted link (4) rest on the spacer web (arrow).

9 Tighten pressure screw (6) until a firm resistance is felt.
While turning the pressure screw (6), ensure that pin in rivet link (4) is inserted in holes in the external mounting link (5).

10 Remove rivet press tool.





11 Move assembly insert with digit D10 onto rivet profile (arrow).





12 Place rivet press tool on new oil pump chain (2) riveted link (4).
Fit the in such a way that pins for the riveted link (4) are located exactly in the center of prism support (arrow).

13 Tighten pressure screw (6).
The torque applied to pressure screw (6) is about 30 to 35 Nm (reference value).

14 Rivet bolts for riveted link (4) individually.





15 Test riveted joints (arrow) and rivet the pins again if necessary.