Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Engine Control Module: Testing and Inspection

CHECK AT THE ENGINE CONTROL MODULE (ECU) [M/T] OR THE POWERTRAIN CONTROL MODULE (PCM) [A/T]

1. Disconnect the ECM [M/T] or the PCM [A/T] connectors B-18, B-19, B-20, B-21 and B-22, and connect check harness special tool MB991923 between the ECM [M/T] connectors or the PCM [A/T] connectors.
2. Measure the voltage between each check harness connector terminal and check harness connector ground terminal (No. 25 or No. 29).

TERMINAL VOLTAGE CHECK CHART

Terminal Voltage Check Chart (Part 1):




Terminal Voltage Check Chart (Part 2):




Terminal Voltage Check Chart (Part 3):




Terminal Voltage Check Chart (Part 4):




Terminal Voltage Check Chart (Part 5):




Terminal Voltage Check Chart (Part 6):




Terminal Voltage Check Chart (Part 7):






TERMINAL RESISTANCE AND CONTINUITY CHECK

Terminal Resistance And Continuity Check (Part 1):




Terminal Resistance And Continuity Check (Part 2):