Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Note | ||||
| To Grind Valves, Add | 2.2 | 0.0 | A | |
| With AC, Add | ||||
| Right Bank | 0.5 | 0.0 | A | |
| Left Bank | 0.2 | 0.0 | A | |
| Both Banks | 0.5 | 0.0 | A | |
| With Cruise Control, Add | 0.4 | 0.0 | A | |
| One CYL | ||||
| Right Bank | 10.8 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Left Bank | 10.6 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Both Banks | 15.0 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| All Cyls | ||||
| Right Bank | 12.9 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Left Bank | 12.7 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Both Banks | 18.2 | 0.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |