Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Main Bearings, Renew | 0.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 4.2 | 0.0 | A | Includes: R&R Engine |
| Oil Pump, Renew | 0.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Gears, Renew | 2.4 | 0.0 | A | Includes: R&R Engine |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| One Cylinder | 8.0 | 5.7 | A | Includes: R&R Cylinder Head And Oil Pan. |
| Note | ||||
| With AC, Add | 0.7 | 0.4 |