Intake Manifold Installation
1. Place the intake manifold in position on the cylinder heads.Intake Manifold Tightening Sequence:
2. Install the six bolts and four studs. Tighten the intake manifold bolts and studs starting from the center and working outward in a circular pattern to 10 Nm (89 inch lbs.).
3. Install the fuel injector harness main connector.
4. Install the PCV valve and feed tubes into the camshaft covers.
5. Connect the EGR pipe to the water crossover and throttle body spacer. Tighten the EGR pipe to 28 Nm (21 inch lbs.).
6. Connect the crankcase ventilation pipe to the throttle body spacer.
7. Connect the fuel rail bracket at the EGR valve.
8. Connect the fuel rail ground wire at the rear cylinder head.
9. Install the intake manifold sight shield with four nuts. Tighten the intake manifold sight shield nuts to 3 Nm (27 inch lbs.).