Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank15.710.9AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Left Bank12.79.4AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Both Banks17.612.7AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
Each Additional0.60.5AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
All Cylinders20.314.6AIncludes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon.
NOTE
To R&R Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.70.0A
To Grind Valves, Add2.32.0A
To R&R Connecting Rod Bearings, Add
Each0.10.0A