Auxiliary Blower Motor: Service and Repair
Auxiliary Blower Motor Replacement
Removal Procedure
1. Remove the left lower quarter trim panel.
2. Remove the power sliding door (PSD) module are reposition.
3. Remove the auxiliary A/C outlet pillar duct bolts (1).
4. Remove the auxiliary A/C outlet pillar duct (2).
5. Disconnect the auxiliary blower motor electrical connector.
6. Remove the auxiliary A/C air distribution duct bolts (1).
7. Remove the auxiliary A/C air distribution duct (2).
8. Remove the auxiliary blower motor mounting screws.
9. Remove the auxiliary blower motor from the blower motor housing.
Installation Procedure
Notice: Refer to Fastener Notice.
1. Install the auxiliary blower motor mounting screws.
Tighten the screws to 1.6 N.m (14 lb in).
2. Install the auxiliary A/C air distribution duct (2).
3. Install the auxiliary A/C air distribution duct bolts (1).
Tighten the bolts to 10 N.m (89 lb in).
4. Connect the auxiliary blower motor electrical connector.
5. Install the auxiliary A/C outlet pillar duct (2).
6. Install the auxiliary A/C outlet pillar duct bolts (1).
Tighten the bolts to 10 N.m (89 lb in).
7. Install the PSD module are reposition.
8. Install the left lower quarter trim panel.