Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








2AZ-FE ENGINE CONTROL SYSTEM: ECM: INSTALLATION

INSTALLATION

1. INSTALL ECM






(a) Install the ECM with the bolt and screw.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)






(b) Connect the 4 ECM connectors.
(c) Install the wire harness clamp.
2. INSTALL GLOVE COMPARTMENT DOOR Installation

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.