Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








2ZR-FE ENGINE CONTROL SYSTEM: ECM: INSTALLATION

INSTALLATION





1. INSTALL NO. 2 ECM BRACKET
(a) Install the No. 2 ECM bracket with the 2 screws.






2. INSTALL ECM BRACKET
(a) Install the ECM bracket with the 2 screws.
3. INSTALL ECM





(a) Install the ECM with the bolt and 2 nuts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)






(b) Connect the 2 ECM connectors.
(c) Install the 2 lock knobs and harness clamp.
4. INSTALL OUTER COWL TOP PANEL Installation

5. INSTALL FRONT AIR SHUTTER SEAL RH Installation

6. INSTALL FRONT WIPER MOTOR AND LINK

7. INSTALL COWL TOP VENTILATOR LOUVER LH

8. INSTALL COWL TOP VENTILATOR LOUVER RH

9. INSTALL HOOD TO COWL TOP SEAL

10. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH

11. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH

12. INSTALL FRONT WIPER ARM HEAD CAP