Installation
FA20 BATTERY / CHARGING: GENERATOR: INSTALLATION; 2013 MY FR-S [03/2012 -]
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 2 bolts.
Torque : 25 Nm (255 kgf-cm, 18 ft-lbf)
(b) Connect the generator connector.
(c) Connect the generator wire with the nut.
Torque : 16 Nm (163 kgf-cm, 12 ft-lbf)
(d) Install the terminal cap.
2. INSTALL FAN AND GENERATOR V BELT
Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)