Reassembly
Part 1 Of 3:
Part 2 Of 3:
Part 3 Of 3:
REASSEMBLY
Reassembly is in the reverse order of disassembly.
NOTICE: When working with FIPG material, you must observe the followings.
^ Using a razor blade and gasket scraper, remove all old FIPG material from the gasket surfaces.
^ Thoroughly clean all components to remove all loose material.
^ Clean both sealing surfaces with a non-residue solvent.
^ Apply FIPG in an approximately 1 mm (0.04 inch) wide bead along the sealing surface.
^ Parts must be assembled within 10 minutes of application. Otherwise be removed and reapplied.
HINT: Coat all of the sliding and rotating surfaces with gear oil before reassembly.