Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Exhaust Manifold





Exhaust Manifold
Using a precision straight edge and feeler gauge, measure the surface contacting the cylinder head for warpage.
Maximum warpage 0.70 mm (0.0276 inch)





Install a new gasket and the exhaust manifold with the 3 bolts 2 nuts. Uniformly tighten the nuts in several passes.
Torque 27 Nm (275 kgf-cm, 20 ft. lbs.)
Install the upper heat insulator with the 4 bolts.
Torque 8.0 Nm (82 kgf-cm, 71 inch lbs.)





Exhaust Manifold Stay
Install the manifold stay with the 3 bolts. Alternately tighten the bolts.
Torque 37 Nm (377 kgf-cm, 27 ft. lbs.)





Front Exhaust Pipe To Exhaust Manifold
Install the 2 bolts and 2 springs holding the front exhaust pipe to the exhaust manifold.
Torque 62 Nm (630 kgf-cm, 46 ft. lbs.)