Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Air Conditioning Switch: Testing and Inspection







COMBINATION SWITCH ASSEMBLY
a. Inspect switch continuity.
Check the continuity between terminals while switch is pressed, as shown in the chart.
If continuity is not as specified, replace the cooler switch.
b. Inspect illumination operation.
Connect the positive (+) lead from the battery to terminal 4 and negative (-) lead to terminal 3 then check that the illuminations light up.
If operation is not as specified, replace the cooler switch.
c. Inspect indicator operation.
1. Connect the positive (+) lead from the battery to terminal 2 and the negative (-) lead to terminal 1.
2. Push the A/C button in and then check that the indicator lights up.
If operation is not as specified, replace the cooler switch.
d. Inspect dimming operation
1. Connect the positive (+) lead from the battery to terminal 2 and the negative (-) lead to terminal 1 while press the switch.
2. Connect the positive (+) lead from battery to terminal 4 and then check that the indicator dims.
If operation is not as specified, replace the cooler switch.