Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Air Injection Control Valve: Testing and Inspection
INSPECT AIR SWITCHING VALVE ASSEMBLY a.
Check the operation.
1.
Apply a vacuum of
28 kPa (210 mmHg, 8.27 in.Hg) to port A, then blow air into port B. Check that the air is discharged from port C.
If the operation is not as specified, replace the air switching valve.