Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








1NZ-FXE STARTING: POWER SWITCH:

INSTALLATION

1. INSTALL POWER SWITCH
(a) Install the power switch to the upper finish panel.
2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (Installation)

3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (Installation)

4. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY (Installation)

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (Installation)

6. INSTALL REAR NO. 3 FLOOR BOARD (Installation)

7. INSTALL REAR DECK FLOOR BOX (Installation)

8. INSTALL REAR NO. 2 FLOOR BOARD (Installation)

9. PERFORM INITIALIZATION
(a) Perform initialization (Repair Instruction - Initialization).

NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.