Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Installation








2UZ-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION

INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)





(a) Install a new O-ring to the camshaft timing oil control valve assembly.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the camshaft timing oil control valve assembly with the bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(d) Connect the camshaft timing oil control valve assembly connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)





(a) Install a new O-ring to the camshaft timing oil control valve assembly.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the camshaft timing oil control valve assembly with the bolt.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(d) Connect the camshaft timing oil control valve assembly connector.
3. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
4. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY Installation