Operation CHARM: Car repair manuals for everyone.

Installation








2TR-FE CHARGING: GENERATOR: INSTALLATION

INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Install the generator with the 2 bolts.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)





(b) Connect the generator connector.
(c) Install the generator wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(d) Install the terminal cap.
2. INSTALL FAN & GENERATOR V BELT Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)