Operation CHARM: Car repair manuals for everyone.

Installation





3UR-FE EMISSION CONTROL: AIR INJECTION DRIVER: INSTALLATION

1. INSTALL AIR INJECTION CONTROL DRIVER ASSEMBLY





(a) Install the air injection control driver with the 3 bolts.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)





(b) Connect the 4 air injection control driver connectors.





(c) Connect the wire harness clamp.

(d) Connect the ground wire with the bolt.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL