Operation CHARM: Car repair manuals for everyone.

Installation





CELLULAR COMMUNICATION: DCM(TELEMATICS TRANSCEIVER): INSTALLATION

1. INSTALL DCM (TELEMATICS TRANSCEIVER)

2. INSTALL NO. 3 TELEPHONE BRACKET

(a) Install the No. 3 telephone bracket with the 2 screws.





3. INSTALL NO. 2 TELEPHONE BRACKET

(a) Install the No. 2 telephone bracket with the 2 screws.





4. INSTALL DCM (TELEMATICS TRANSCEIVER) WITH BRACKET

(a) Install the DCM (telematics transceiver) with bracket with the 3 bolts.





(b) Connect the 3 connectors.

5. INSTALL BACK-UP BATTERY WITH BRACKET Installation

6. INSTALL UPPER INSTRUMENT PANEL ASSEMBLY

HINT
Refer to the procedure from Install Upper Instrument Panel Assembly Installation.

7. DCM ACTIVATION

(a) When replacing the DCM (telematics transceiver), perform DCM activation DCM Activation.