Installation
2ZR-FXE BATTERY / CHARGING: BATTERY: INSTALLATION
1. INSTALL AUXILIARY BATTERY
(a) Install the battery.
(b) Connect the battery ventilation hose to the battery without kinking it.
HINT
Push in the battery ventilation hose to the battery until a click sound is heard.
(c) Install the battery clamp with the bolt and nut.
Nut - Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
Bolt - Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(d) Install the battery thermometer sensor connector
(e) Connect the positive (+) battery terminal with the nut.
(f) Install the battery terminal cap.
(g) Engage the 2 claws to install the No. 3 rear floor board plate upper.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
3. INSTALL REAR NO. 3 FLOOR BOARD Installation
4. INSTALL REAR DECK FLOOR BOX Installation
5. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation