Installation
ENGINE IMMOBILISER: ID CODE BOX (w/ Smart Key System): INSTALLATION
1. INSTALL ID CODE BOX
(a) Install the ID code box with the bolt.
(b) Attach the clamp.
(c) Connect the connector.
2. INSTALL AIR CONDITIONER UNIT ASSEMBLY
(a) Install the air conditioner unit Installation.
3. INSTALL LOWER INSTRUMENT PANEL
(a) Install the lower instrument panel Installation.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL