Pinout Values and Diagnostic Parameters
CRUISE CONTROL: CRUISE CONTROL SYSTEM: TERMINALS OF ECM
1. CHECK ECM
(a) Disconnect the A9 and B30 connectors.
(b) Measure the voltage and resistance of the wire harness side connectors.
(c) *1: 2GR-FE
*2: 2AR-FE
If the result is not as specified, there may be a malfunction on the wire harness side.