Installation
U241E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.
(c) Install a new lock washer and tighten the manual valve shaft nut.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with neutral basic line.
(h) Hold the switch in this position and tighten the 2 bolts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(i) Using a screwdriver, stake the nut with the lock washer.
(j) Install the control shaft lever with the washer and nut.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(k) Connect the shift control cable to the control shaft lever with the nut.
Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)
(l) Connect the switch connector.
2. INSTALL BATTERY
(a) Install the battery bracket reinforcement with the 2 bolts.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Install the battery carrier with the 4 bolts.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(c) Install the battery tray.
(d) Install the battery with the battery clamp.
Torque : 17 Nm (168 kgf-cm, 21 in-lbf for bolt)
Torque : 4.9 Nm (50 kgf-cm, 43 in-lbf for nut)
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. ADJUST SHIFT LEVER POSITION
(a) Adjust the shift lever position Adjustments.
5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Inspect the switch On-Vehicle Inspection.