Installation
2TR-FE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(b) Connect the starter connector.
(c) Connect the starter wire harness with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Install the terminal cap.
2. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY Installation
3. INSTALL REAR ENGINE UNDER COVER ASSEMBLY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.